Website News |
Application Stories
Lisbon, Portugal: Here in the center of Lisbon, a seven-level underground shopping center and parking garage are being built around and under the Palais Sotto Mayor. The palace, constructed in the first decade of the 1900s, is a popular tourist attraction and reflects the style and riches of Portugal's colonial past.
Fourteen inclinometers were installed to monitor lateral movements adjacent to the tunnels and major buildings. A portable tiltmeter and tilt plates were also used. A tape extensometer was used to monitor the convergence in the subway tunnel, and four VW piezometers were installed for monitoring dewatering. The excavation, now in its final stages, took about nine months. To date, instrumentation has shown that displacements are smaller than predicted and within acceptable limits. Thanks to Dr. J.M.M. dos Santos, Tecnasol FGE for providing this story and the Lisbon National Library for the historical facts and photograph. Tecnasol FGE are the structural engineers and main construction contractor for the project. Previous Stories |